More often than not the only time we know that a road, junction or crossing is dangerous is when someone is hurt or killed there. This is hardly satisfactory.

A well researched STP that consults properly with parents, pupils, and staff can often reveal several unsuspected areas of concern, from busy crossings, to unlit alley ways to restrictive pavements or the lack of cycling infrastructure.

Using your document we can bid for implementation money to pay for road improvements in the vicinity of your school. Funds are not unlimited but schools within Hounslow have benefited from such measures as road calming schemes, new crossings and improved cycle lanes.

Engineers from the traffic department are available for meetings with school travel plan steering groups to discuss particular issues and to offer insights as to how they could be addressed. Contact your STA to arrange a meeting.

Examples of the sort of schemes that can be considered, and their approximate cost are:


Scheme Approximate Cost

Road hump

£500 to £5,000

Speed table

£15,000 to £25,000

Speed cushion

£700

Rumble strips

£1,000

Zig-zags ‘School Keep Clear’

£250

Wig-wags (flashing lights)

£4,400 set of four

Guard rail

£250 per metre

Zebra crossing

£15,000

Pelican crossing

£20,000 to £30,000

Puffin crossing

£20,000 to £30,000

Toucan crossing

£20,000 to £30,000

ATS (traffic signals)

£50,000 to £100,000

Junction entry treatment

£10,000 to £15,000

Tactile paving

£250 per drop kerb

Pinch point (width restriction)

£10,000 to £15,000

Gateway (school approach)

£5,000 to £10,000

Bollard

£150

Rising bollard

£6,000

Mini-roundabout

£5,000 to £10,000

Pedestrian refuge

£2,500

Anti-skid surfacing

£2,000 per 20 metres of average road

Overrun area

£2,000

Road closure

£5,000 to £10,000

20 mph zone

£250,000 to £1,000,000

Print text
School Travel Plans logo
What is a STP?
Why produce a STP?
How to produce a STP
The Council's Role
Contact Us
stp_downloads
the hub

Engineering

More often than not the only time we know that a road, junction or crossing is dangerous is when someone is hurt or killed there. This is hardly satisfactory.

A well researched STP that consults properly with parents, pupils, and staff can often reveal several unsuspected areas of concern, from busy crossings, to unlit alley ways to restrictive pavements or the lack of cycling infrastructure.

Using your document we can bid for implementation money to pay for road improvements in the vicinity of your school. Funds are not unlimited but schools within Hounslow have benefited from such measures as road calming schemes, new crossings and improved cycle lanes.

Engineers from the traffic department are available for meetings with school travel plan steering groups to discuss particular issues and to offer insights as to how they could be addressed. Contact your STA to arrange a meeting.

Examples of the sort of schemes that can be considered, and their approximate cost are:


Scheme Approximate Cost

Road hump

£500 to £5,000

Speed table

£15,000 to £25,000

Speed cushion

£700

Rumble strips

£1,000

Zig-zags ‘School Keep Clear’

£250

Wig-wags (flashing lights)

£4,400 set of four

Guard rail

£250 per metre

Zebra crossing

£15,000

Pelican crossing

£20,000 to £30,000

Puffin crossing

£20,000 to £30,000

Toucan crossing

£20,000 to £30,000

ATS (traffic signals)

£50,000 to £100,000

Junction entry treatment

£10,000 to £15,000

Tactile paving

£250 per drop kerb

Pinch point (width restriction)

£10,000 to £15,000

Gateway (school approach)

£5,000 to £10,000

Bollard

£150

Rising bollard

£6,000

Mini-roundabout

£5,000 to £10,000

Pedestrian refuge

£2,500

Anti-skid surfacing

£2,000 per 20 metres of average road

Overrun area

£2,000

Road closure

£5,000 to £10,000

20 mph zone

£250,000 to £1,000,000